This negotiated, time-sensitive renovation was a "build out" of the regional Poudre Valley Hospital. The owner had specific scheduling needs that had to be met from an operational standpoint and Drahota was heavily involved during preconstruction and construction. The project finished ahead of schedule. Many constructability issues arose from working in a fully functional busy hospital, including major access issues. We had the use of one stairwell and limited access to the elevator. A number of times, windows were removed to crane materials in to the elevated floor. Drahota had a full-time crew working solely on safety and cleanliness.

Another project challenge was the fact that the 4th floor was a psychiatric ward where construction noise directly affected the patients. Drahota worked with doctors, nurses and hospital facilities to maintain limited disturbance. “Drahota was instrumental in the success of this project. Using their excellent talent and knowledge both in communication and problem solving during all phase of construction was key”, Dave Cottle, Director, Poudre Valley Heath System.